A memory care conversion inside a live seniors facility, including full plumbing replacement.

Westney Gardens required the conversion of 12,000 sq. ft. within their Ajax facility into a dedicated memory care ward, purpose-built for seniors requiring enhanced cognitive support. The project was delivered inside a fully operational building, where resident care continued without interruption throughout every phase of construction. Beyond the interior reconfiguration and life safety upgrades, the scope included a full replacement of the plumbing infrastructure within the project area, addressing widespread corrosion, active leaks, and aging systems that could not be deferred. Executing a plumbing overhaul of that scale inside a live care facility required isolation strategies, precise sequencing, and continuous coordination with facility staff to maintain uninterrupted service at all times. Phasing was structured around the rhythms of the care environment, with safety protocols governing every aspect of how and when work was carried out. The result is a safe, functional memory care environment that serves both residents and the staff who support them.
Memory care environments sit at the intersection of healthcare construction and occupied building renovation, and both demand the highest standard of site discipline. Phasing was the foundation of the entire delivery strategy, with each stage planned to protect resident safety, preserve care routines, and contain construction activity within clearly defined zones. The plumbing replacement was the most technically demanding element: isolating and replacing aging infrastructure within a live facility required careful system mapping, staged shutdowns coordinated with facility management, and immediate reinstatement of services after each intervention. Active leaks and corroded systems introduced unpredictability that had to be managed without derailing the broader schedule. Throughout, communication with facility staff was continuous, ensuring that any impact to care operations was anticipated and mitigated before it became a disruption. Projects in care environments require a team that understands the weight of the environment they are building in, and executes accordingly.
Toronto, ON
A 56,000 sq. ft. wealth management headquarters built for quiet authority.


St. Catharines, ON
A federal agency workspace delivered on time and on budget during the pandemic.


Toronto, ON
Five floors of bold, branded workspace built for a company on the move.

